by Gentry Burch | Mar 27, 2019 | Case Studies, Machine Alignment, Power Generation
A large hydro power generating facility ran into some difficulty during the final phases of a rebuild of one of their vertical turbines. The contractor responsible for the rebuild had used a tight wire to obtain the centerline of the turbine, however, at some point...