by George LeGrand | Apr 25, 2019 | Case Studies, Machine Alignment, Nonwovens & Textiles
OASIS Alignment Services was contracted to work at a carpet production facility that runs a large plastic coating line that coats carpet back with plastic film. This plastic coating line is approximately 250 feet long and three stories high. The line consists of an...
by Gentry Burch | Mar 27, 2019 | Case Studies, Machine Alignment, Power Generation
A large hydro power generating facility ran into some difficulty during the final phases of a rebuild of one of their vertical turbines. The contractor responsible for the rebuild had used a tight wire to obtain the centerline of the turbine, however, at some point...